The Japan International Cooperation Agency (JICA) undertook initiatives to support the development of Economic Zones (EZs) in Bangladesh and strengthen the capacity of the Bangladesh Economic Zones Authority (BEZA). As part of this initiative, a comprehensive assessment was required to identify and evaluate potential sites for Economic Zone development, particularly in and around Dhaka Division. Young Consultants, in association with World Business Associates Co., Ltd. and other international consulting firms, contributed to the assignment by conducting preliminary site assessments and collecting relevant technical, environmental, social, engineering, and financial information to support the selection of suitable locations.
The assignment involved assessing several potential sites, including Nayanpur, Araihazar, Dohar, Bandar, Keraniganj, Kaliakoir, Sonargaon, and Meghna. The assessment process began with a review of available background information, followed by site visits to examine each location’s geographical position, size, surrounding context, existing infrastructure, land-use characteristics, and development potential. Particular attention was given to identifying critical constraints or potential deal-breakers that could make a site unsuitable for development, either because they could not be mitigated or because mitigation would be technically impractical or financially prohibitive.
A detailed review of the surrounding areas was conducted to understand each site’s accessibility, regional connectivity, and relationship with nearby communities and infrastructure. The team examined the locations and distances of nearby urban and rural settlements, hospitals, schools, airports, railway connections, seaports, and national highways. Existing residential, commercial, agricultural, and other land uses in the vicinity were reviewed to identify potential conflicts with large-scale Economic Zone development. The assessment also considered environmental and social challenges in the surrounding areas that could affect project implementation, site suitability, or long-term operational sustainability.
The physical and environmental characteristics of each potential site were assessed through field visits and observations. This included examining topography and landscape features, such as floodplains, hills, rivers, water bodies, and vegetation; reviewing soil characteristics through visual assessment without soil testing; and considering climatic conditions and earthquake-related risks. The team also documented existing land uses, agricultural activities, industrial operations, vegetation patterns, buildings, infrastructure, and other physical features, including houses, religious structures, historical sites, and graveyards. Potential illegal settlements and other constraints were identified as part of the site screening process.
Environmental assessments focused on identifying risks and requirements that could influence the feasibility and cost of developing an Economic Zone. The team reviewed potential exposure to flooding and erosion, the presence and implications of rivers, lakes, wetlands, and protected areas, and the possible need for land filling or elevation adjustments. Other considerations included the availability and sources of clean water, existing pollution and possible contamination of the site or adjacent land, wastewater discharge and treatment facilities, and the proximity of solid waste disposal facilities. These observations were used to identify environmental constraints, potential mitigation requirements, and issues requiring further investigation before a site could be selected for development.
The assignment also examined the social characteristics of each site and its surrounding communities. This included reviewing the size and characteristics of nearby urban and rural populations, existing housing conditions, community facilities and services, and the principal livelihoods of local inhabitants, such as farming, fishing, livestock rearing, and small businesses. Particular attention was given to the potential effects of Economic Zone development on women’s livelihoods, local communities, and access to essential services. The team considered whether resettlement might be necessary and, where relevant, the approximate number of people who could be affected. Potential social constraints and issues requiring further assessment were documented as part of the site evaluation.
In addition to the physical, environmental, and social assessments, the team reviewed the financial implications of developing the proposed Economic Zones. This included identifying preliminary costs associated with land development, site preparation, and the provision or connection of essential utilities, including gas, electricity, and telephone services, as well as other related infrastructure and development requirements. Consultations were held with BEZA and relevant government officials, including the local Assistant Commissioner (Land) and other local authorities, to gather information and support the assessment process. The findings from the site visits, technical reviews, stakeholder consultations, and preliminary cost assessments were consolidated into presentations and draft and final reports to inform the evaluation and selection of potential Economic Zone locations.
Key Assignment Details
Assignment Name: Project for Development of Economic Zones and Capacity Enhancement of Bangladesh Economic Zones Authority
Client: Japan International Cooperation Agency (JICA), Bangladesh
Location: Dhaka Division, Bangladesh
Contract Value: Approximately US$42,500
Duration: April 2015 – July 2015
Reported Assignment Duration: 3 months
Total Staff-Months: 5
Associated Consultants: World Business Associates Co., Ltd.; Oriental Consultants Co., Ltd.; RECS International Inc.; Nikken Sekkei Civil Engineering Ltd.; and Japan Development Institute (FDI)
Senior Professional Staff Involved: M. Zakir Hossain; Prof. Salma Akhter, Social Expert; Dr. Mustafa M. Kamal, Environmental Expert; Dr. Akhter Hossain Chaudhury, Urban Planner; Jubaer Arefin; Md. Moshiur Rahman; and Mr. Shofiul Islam, Junior Environmental Expert
Principal Services Provided: Preliminary site assessment and screening; review of site context and regional infrastructure; physical and engineering assessment; environmental and social screening; preliminary development and utility cost assessment; consultations with BEZA and government officials; site assessment presentations; and preparation of draft and final reports.