Project

Site Assessment to set up a Hi-Tech Park in Kaliakor, Gazipur

project-cover-yc-young-consultants
Client(s):
IFC - Bangladesh Investment Climate Fund
Duration:
March 2011-June 2011
Site Assessment to Establish a Hi-Tech Park in Kaliakoir, Gazipur

The assignment involved conducting a comprehensive site assessment to determine the suitability and development viability of the proposed Kaliakoir Hi-Tech Park in Gazipur, Bangladesh. The IFC–Bangladesh Investment Climate Fund (BICF) engaged Young Consultants (YC) to assess the physical characteristics, land-use patterns, existing infrastructure, utility availability, access conditions, and development requirements of the selected site. The assignment also included reviewing and providing comments on the feasibility study report prepared by PricewaterhouseCoopers (PwC). The assessment aimed to identify infrastructure requirements, evaluate potential site development constraints, estimate relevant land development and infrastructure costs, and provide recommendations to support informed planning and implementation of the proposed Hi-Tech Park.

Scope of Services Provided
The assignment covered an integrated assessment of the proposed site, including geographical mapping, physical and land-use analysis, infrastructure assessment, preliminary development cost estimation, and feasibility report review. The principal services provided included:

Site Boundary Identification and Mapping: Identified and verified the boundaries of the proposed Hi-Tech Park site in Kaliakoir, Gazipur, and prepared maps illustrating the site’s extent and configuration to support subsequent assessment and development planning.

Soil and Terrain Assessment: Examined the general soil characteristics across the site without conducting soil testing, as testing was not permitted during this phase. Prepared descriptions of the soil types and mapped areas where variations in soil characteristics were identified. Assessed the site’s terrain and landscape features, including rolling hills, plains, floodplains, and forested areas, and documented their locations through descriptive mapping.

Vegetation and Natural Features Assessment: Identified and documented the type, distribution, and density of vegetation across the site, including trees and cultivated crops. Examined the locations of ponds, rivers, lakes, dense groups of trees, and nearby villages, and prepared descriptive and sketch maps to illustrate these natural and settlement features.

Existing Buildings, Structures, and Land-Use Assessment: Identified existing buildings, infrastructure, and community facilities within the site, including bridges, houses, and other structures. Documented their locations, construction materials, and whether they were permanent or temporary. Assessed existing land-use categories, including residential, commercial, and institutional uses, and mapped their respective locations. Obtained the municipality’s land-use map and consulted the planning department regarding the proposed land-use designation and future development plans for the site.

Off-Site Infrastructure and Utility Requirements Assessment: Identified the off-site infrastructure requirements necessary to support the proposed Hi-Tech Park. Examined the locations and availability of existing utility services, including water supply, electricity, and telephone connections, and documented their service coverage and the number of people served, where information was available. Identified infrastructure gaps and considered the requirements for extending or improving utility services to support the proposed development.

Road Network and Site Accessibility Assessment: Identified and mapped the existing internal roads and principal access points to the site. Examined road characteristics, including surface conditions, whether roads were paved or unpaved, lane configurations, and the availability of street lighting. Documented key roadways and site entry points to assess accessibility and identify road infrastructure requirements for the proposed Hi-Tech Park.

Land Development and Flood Protection Cost Assessment: Prepared cost estimates for land filling and/or flood embankment construction, where required. Considered the types of materials needed, potential settling periods, the proposed sources of fill materials, and the estimated height of land filling or embankments. Assessed the relevant cost considerations for site preparation and flood protection to inform preliminary development planning.

Site Grading and Internal Road Cost Estimation: Developed unit-cost estimates for site grading on a per-square-metre basis, where grading might be necessary. Also estimated the linear-metre cost of constructing roads designed to accommodate heavy trucks, supporting preliminary budgeting for site preparation and internal transport infrastructure.

Feasibility Study Review: Reviewed the feasibility study report prepared by PricewaterhouseCoopers (PwC) and provided comments as part of the assignment. The review complemented the site assessment by considering the proposed site’s suitability and the physical and infrastructural requirements relevant to the development of the Hi-Tech Park.

Reporting, Recommendations, and Documentation: Consolidated the findings of the site inspection, boundary and feature mapping, soil and terrain assessment, land-use analysis, infrastructure review, utility assessment, and preliminary development cost estimates. Prepared a detailed site assessment report presenting the site’s characteristics, infrastructure requirements, development considerations, cost estimates, and recommendations for the proposed Kaliakoir Hi-Tech Park.

Key Deliverable
A detailed Site Assessment Report for the proposed Kaliakoir Hi-Tech Park in Gazipur, including site boundary and feature maps, soil and terrain descriptions, vegetation and land-use assessments, existing infrastructure and utility information, road accessibility analysis, off-site infrastructure requirements, preliminary cost estimates for land filling, flood embankments, site grading and heavy-truck roads, and recommendations for site development. The assignment also included a review of and comments on the feasibility study report prepared by PwC.

Assignment Details
Client: IFC – Bangladesh Investment Climate Fund (BICF)

Project Location: Kaliakoir, Gazipur, Bangladesh

Client Address: Gulshan, Dhaka, Bangladesh

Contract Value: Not specified in the provided assignment information

Duration: 3 months (March 2011–June 2011, as recorded in the assignment details)

Total Staff-Months: 3 staff-months

Associated Consultants: Not specified

Senior Professional Staff and Roles:

Mr. M. Zakir Hossain – Project Manager
Dr. Akhter Hossain Chaudhury – Site Assessment Expert
Mr. A. K. Alamgir Kabir Dewan – GIS Expert
S. M. Firoz Hasan – Coordinator